Standard
Track updates
AS/NZS 3666.1:2011
[Current]Air-handling and water systems of buildings — Microbial control, Part 1: Design, installation and commissioning
Specifies minimum requirements for the design, installation and commissioning of air-handling and water systems of buildings for the purposes of microbial control. It does not include requirements for refrigerated room airconditioners and non-ducted split systems.
Published: 20/01/2014
Pages: 17
Table of contents
Cited references
Content history
Table of contents
Header
About this publication
Preface
Foreword
1 Scope and general
2 Design, installation and commissioning of air-handling systems
3 Design, installation and commissioning of heated water systems
4 Design, installation and commissioning of cooling water systems
Appendix A
Bibliography
Cited references in this standard
[Current]
Fixed platforms, walkways, stairways and ladders - Design, construction and installation
[Current]
The use of ventilation and airconditioning in buildings, Part 2: Mechanical ventilation in buildings
Content history
DR AS/NZS 3666.1
AS/NZS 3666.1:2002
One-time Purchase
Access via web browser on any device
One-time purchase
Single publication
Offline access via PDF^
$106.99 AUD
Inclusive of GSTFormat *
Web Reader
Licenses *
1 user
Total$106.99 AUD
IMPORTANT